Saltar al contenido de la página

We proudly participated in the ABU MARIA PROJECT, implemented in Iraq and completed in 2019, delivering a comprehensive range of high-quality valves and accessories for water infrastructure applications. The project was carried out under challenging conditions, transporting river water at ambient temperature with a maximum operating pressure of 25 bar. Our solutions were designed to ensure reliability, durability, and long-term operational efficiency.

Read the full project story here.

Abu Maria Project Iraqpdf676.38 KB
water-treatment-shutterstock_1752757748

Este sitio web utiliza cookies

Este sitio utiliza cookies para proporcionar servicios, personalizar anuncios y analizar el tráfico. Al utilizar este sitio usted acepta esto. Ver detalles

Configuración de cookies

Su privacidad es importante. Puede elegir entre la configuración de cookies a continuación. Ver detalles